Guides
- Acoustic ratings (Rw) explained for partitions
What an Rw rating means for a partition, how Rw differs from Rw + Ctr and DnT,w, why site results fall short, and what to ask when a spec gives a number.
- Metal stud partition cost per m²: building the rate
How to work out the cost of a metal stud partition wall per m²: materials per m², waste, labour from your own outputs, height and access, then overheads and profit.
- Moisture-resistant plasterboard in wet areas
Where moisture-resistant plasterboard goes, what it does and does not do, how wet zones and tanking change the package, and how to take off a washroom by zone.
- Plasterboard types and where each one goes
The main types of plasterboard used in UK drylining, what each is for, where it usually goes, and how to keep board types apart in the take-off and on site.
- Deflection heads and stud centres: when each is required
When a deflection head is required on a drylining partition, where stud centres come from, why both change with height, fire and board, and how to price them.
- Trade accounts with builders merchants
How a builders merchant trade account works for subcontractors: the application, credit limit, payment terms, who can order, and a monthly statement check to copy.
- C stud vs I stud
C stud vs I stud: how the two metal stud sections differ, why a system calls for one, why you cannot swap them, and how to check stud lines on a merchant quote.
- Cash flow forecast template for subcontractors
A monthly cash flow forecast template for drylining subcontractors: when money comes in and goes out, a worked six-month example and the peak funding need.
- CIS deductions explained for subcontractors
How CIS deductions work for UK subcontractors: the 20%, 30% and gross rates, what the deduction is taken from, a worked payment and statement checks.
- Payment timetable under the Construction Act for subcontractors
The Construction Act payment cycle for subcontractors: due date, payment notice, pay less notice, final date, the Scheme defaults and a worked timeline.
- Contingency and risk in a subcontract price
How to build a risk allowance into a subcontract tender: list each risk, weigh its likely cost, then price, qualify or exclude it, with a worked risk table.
- Contra charges: how to check and challenge them
How to check a contra charge: the clause behind it, notice, evidence, cause and amount, with a register to copy and how to dispute it in writing.
- Day rates vs price work for drylining gangs
Day rates vs price work for drylining gangs: who carries the productivity risk, what each needs from you on site, and a worked example at three outputs.
- Dayworks vs variations: which to use
A decision guide for subcontractors: when to value extra work as daywork, when as a priced or measured variation, who carries the risk, and a worked comparison.
- Defects period costs for interiors subcontractors
What the defects period costs an interiors subcontractor: return visits, access, materials and supervision, a worked allowance against retention, and a defects log to copy.
- Recording delay and disruption evidence
What a subcontractor should record when work is delayed or disrupted: the event, the cause, the notice, the lost time and cost, with a record sheet and a worked example.
- Distribution and hoisting on multi-storey jobs
How to plan and price distribution of drylining materials on multi-storey jobs: who moves what, hoist and lift limits, floor loading and a worked trip count.
- Qualifications and exclusions on a drylining quote
How to write qualifications and exclusions on a drylining quote: the difference, example wording to adapt, and how to carry them into the subcontract.
- Drylining vs plastering
Drylining vs plastering: how the two methods differ, where a skim coat fits, and how each changes drying, programme, package boundaries and the price.
- Fixed price vs fluctuations: material inflation clauses
Fixed price vs fluctuations for subcontractors: firm price, price validity, actual cost and formula clauses, and a worked board price rise under each one.
- Free estimating software for UK subcontractors: what you get
What free estimating software usually means for a UK subcontractor: trials, free plans and calculators, the limits to check and what happens to your data.
- Goods received notes: checking deliveries
What a goods received note should record on a drylining job: what arrived against the order, shortages, damage and substitutions, a worked GRN, and how it feeds the job cost once.
- Handover documents for interiors subcontractors
What an interiors subcontractor supplies for the O&M manual and handover file: as-built records, product data, installation records, photos, with a tracker to copy.
- Interim valuation template for subcontractors
An interim valuation template for subcontractors: contract work, variations, dayworks and materials on site, a worked example and a table to reconcile the assessment.
- Job costing for subcontractors: the basics
Job costing for subcontractors: give every cost a job and a cost code, split mixed invoices, allocate labour from timesheets, and a cost code list to copy.
- Labour-only vs supply-and-fix drylining
Labour-only vs supply-and-fix drylining: who buys the materials, who carries waste and price risk, how CIS and cash flow differ, with a worked comparison.
- Liquidated damages passed down to subcontractors
How liquidated damages reach a subcontractor: a stated subcontract rate or the main contractor's actual loss, caps, extensions of time and a worked exposure table.
- Margin tracking software for subcontractors
What construction margin tracking software has to hold for a subcontractor, why accounts alone can mislead, the main types of tool and the questions to ask.
- Scheduling material deliveries on site
How to schedule drylining material deliveries from the programme: working back from the start date, booking site slots, a delivery schedule to copy and a worked week.
- Storing and protecting drylining materials on site
How to store and protect plasterboard and other drylining materials on site: flat and dry storage, floor loading, damage responsibility and a checklist.
- Measuring work done for price-work gangs
How to measure work done for drylining price-work gangs: agree the rules first, pay by stage, a weekly measure sheet to copy and a worked week.
- Returns and credit notes with builders merchants
How to return surplus or wrong materials to a builders merchant: what to agree first, restocking charges, chasing the credit note and posting it to the job.
- Metal stud spacing: 600 or 400 centres?
When a metal stud partition goes at 600 or 400 mm centres: board, finish, fixtures and height, what closer centres add, and what to do when drawings are silent.
- Early warnings on NEC subcontracts
How early warnings work on an NEC subcontract: what to warn about, the register and meetings, how a missed warning can reduce a compensation event, and an example register.
- How to calculate your overhead recovery rate
How a subcontractor calculates an overhead recovery rate: the overhead budget, which base to divide by, a worked example, and how to spot under-recovery.
- Insulation in partitions: what to price
How to price insulation in a stud partition: why it is there, what the specification must say, how to measure it by cavity, and the labour it adds.
- Pay less notices: what a subcontractor should check
What to check when a pay less notice arrives: the notified sum, the timing, the sum and basis stated, each deduction, and how to reply in writing.
- Main contractor payment terms and your cash flow
How long payment terms change a subcontractor's cash gap: where the days are counted from, a worked 30 vs 60 day comparison, the finance cost, and what to do at tender.
- Plasterboard price rises: protecting a tender
How a drylining subcontractor protects a tender from plasterboard price increases: match validity, state the price basis, test exposure and time buying.
- Plasterboard sizes and thicknesses in the UK
Common UK plasterboard sizes and thicknesses, the area of each sheet, how to choose a board length to suit the wall height, and what to check before you order.
- Waste allowance for plasterboard
How to set a plasterboard waste allowance from your own jobs: what drives waste, how to measure it from delivered, returned and installed board, and how to use it.
- Price list vs quote vs trade price: which should you price with?
The difference between a merchant's list price, your trade price and a project quote, which one to put in a tender, and how to check each on the invoice.
- Pricing access equipment in a drylining job
How to price towers, podiums and other access in a drylining tender: zone the job by height, count units and weeks from the programme, with a worked build-up.
- How to price making good
How to price making good on drylining work: your own making good versus repairs after others, size bands for service holes, return visits and a worked build-up.
- Pricing out-of-hours and night work
How a drylining subcontractor prices out-of-hours and night work: enhanced pay, lost output, per-shift costs and site rules, with a worked day vs night comparison.
- Pricing from a schedule of rates
How to price a schedule of rates when quantities are unknown: what each rate must carry, where fixed job costs go, and a worked table of under-recovery.
- Procurement software for construction subcontractors
What procurement software should do for a construction subcontractor, the main types to compare, and the questions to ask about orders, deliveries and invoices.
- Profit per job: a simple report for directors
A one-page profit per job report for subcontractor directors: one line per job, forecast against tender margin, a worked five-job example and what to look for.
- Provisional sums vs PC sums
Provisional sums vs prime cost (PC) sums for interiors subcontractors: what each is, how to price them in a tender and how they are adjusted, worked through.
- Reading drawings for a drylining take-off
Which drawings a drylining estimator needs, what to take from each, how to check scale and revisions, and how to spot conflicts before you measure.
- Specification review before pricing a drylining package
How to review a drylining specification before pricing: named products, design duties, finish standards, mock-ups, testing and the clauses that hide cost.
- Spreadsheet vs estimating software for subcontractors
When a spreadsheet is still the right estimating tool for a subcontractor, the signs you have outgrown it, how to keep it sound and how to switch safely.
- Attendances: what a subcontract usually includes
What attendances in a subcontract usually cover: general vs special attendance, a schedule to agree before you sign, and what a missing attendance costs.
- Subcontract order checklist before you sign
A subcontract order checklist for drylining and interiors subcontractors: parties, documents, scope, price, programme, payment, retention, tax and liabilities.
- Preliminaries a drylining subcontractor should price
The preliminaries a drylining subcontractor should price: fixed, time-related and site costs, how they differ from overheads, and a worked 16-week build-up.
- Tape and joint vs skim finish
Tape and joint vs skim on plasterboard: what each finish involves, which board edge suits which, what drives the cost of each, and how to price it.
- How main contractors compare subcontract tenders
How main contractors adjudicate subcontract tenders: compliance, scope levelling, terms, programme and quality, with three bids levelled in a worked table.
- Tender register template
A tender register template for drylining subcontractors: the columns to keep, a filled-in example, a go or no-go check for each enquiry, and follow-up dates.
- Tracking your tender win rate
How a subcontractor tracks tender win rate: by number and by value, what to leave out, a worked year by client, and how many tenders you need to fill a year.
- VAT domestic reverse charge for subcontractors
How the VAT domestic reverse charge works for UK subcontractors: when it applies, checks before you invoice, what the invoice shows and the cash effect.
- Weekly cost report for a drylining job
A one-page weekly cost report for a drylining job: cost this week against the allowance for work done, where the figures come from, a template and a worked week.
- What is drylining?
What drylining is in UK construction: the work a drylining package covers, what a system is made of, who does the work and how the package is priced.
- Bill of quantities software for interiors subcontractors
What bill of quantities software should do for interiors subcontractors: a BoQ by system and revision, your own rates, and a BoQ that carries into buying.
- Budget vs actual cost template for a drylining job
A budget vs actual cost template for a drylining job: the lines to track, a blank table to copy, a filled-in example, and how to read the variance.
- How to build a drylining rate: labour, materials and overheads
How to build a drylining rate per m²: materials and waste, labour from your own outputs, access and job costs, then overheads and profit, worked through.
- Call-off register template for drylining jobs
A call-off register template for drylining jobs: the columns to keep, a blank table to copy, a filled-in example and how to use it on site.
- How to check supplier invoices against orders and delivery notes
A practical way to check merchant invoices against orders and delivery notes: what to look for line by line, how to raise a query and how to keep a log.
- How to compare merchant quotes for a drylining BoQ
How to compare merchant quotes for a drylining BoQ: one reference list, line by line matching, the same units, and the costs the unit price leaves out.
- Cost value reconciliation (CVR) template for subcontractors
A cost value reconciliation template for subcontractors: value, cost, accruals and margin to date, a blank table to copy, a filled-in example and checks.
- Daily site reports for drylining: what to record
What a drylining daily site report should record: labour, work done by area and activity, deliveries, delays, instructions and photos, with a template to copy.
- Dot and dab vs metal-frame lining: what changes in the price
Dot and dab vs metal-frame wall lining: how materials, labour, wall condition, services, insulation and tolerances change the price per m² of each method.
- Drylining BoQ example: a worked layout
A worked drylining BoQ example: the sections to use, how to describe each line, a filled-in layout for one floor and a blank table to copy.
- Drylining call-offs: how to stop margin leaking
Where drylining call-offs lose money and how to control them: budgets by area, who can order, a running register, delivery planning and surplus material.
- What to look for in drylining estimating software
A buyer's checklist for drylining estimating software: measuring by system, quantities you can check, your own merchant prices, labour, margin and trials.
- Setting your drylining labour rate in the UK
How to set a drylining labour rate in the UK: the full yearly cost of an operative, on-costs, productive days, labour-only gangs and your daywork rate.
- Purchase orders for drylining subcontractors: what to include
What a drylining purchase order should include: job and delivery details, exact products, quantities, units, agreed prices, delivery terms and checks.
- Drylining quote template for your clients
A drylining quote template for main contractors and clients: the sections to include, a blank table to copy, a filled-in example and checks before you send.
- How to calculate margin on a drylining subcontract
How to calculate margin on a drylining subcontract: net contract value, every cost line, gross and net margin, and when to recalculate, worked through.
- From system spec to material list: a drylining take-off guide
How to take off a drylining job: read the spec, measure by system type, list linear items, build up components and turn it all into a material list you can buy.
- Drylining tender checklist: what to check before you submit
A drylining tender checklist to run before you submit: documents, take-off, rates, merchant prices, access, programme, exclusions, terms and the final total.
- Estimating software for fit-out subcontractors
What fit-out subcontractors pricing multi-trade packages need from estimating software: trade sections, sub-quotes, shared preliminaries and interfaces.
- FixMargin vs Excel for pricing drylining jobs
A fair comparison of Excel and FixMargin for pricing drylining jobs: what spreadsheets do well, where they break, and what FixMargin does and does not do.
- How many plasterboards do I need?
How many plasterboards a wall needs: area per face, faces and layers, openings, sheet size, then a waste allowance and rounding up, with a worked example.
- Independent wall lining: take-off and pricing
How to take off and price an independent wall lining: measure by lining type and height, list reveals and linear items, then build the rate per m².
- Invoice query log template for drylining subcontractors
An invoice query log template for drylining subcontractors: the columns to keep, a blank table to copy, a filled-in example and how to close every query.
- Markup vs margin in construction, with a worked table
Markup vs margin in construction: the two formulas, a conversion table from markup to margin and back, and how to price to a target margin.
- How to negotiate drylining material prices with merchants
How to negotiate drylining material prices with merchants: what to prepare, what to ask for beyond the unit price, and how to record what was agreed.
- How to price a drylining job in the UK
A plain guide to pricing drylining work in the UK: reading the documents, measuring by system, labour, extras, margin and what to put in your offer.
- Recording variations on drylining jobs
How to record variations on drylining jobs: capture the instruction, keep the evidence, price the full cost and run one log that goes with every application.
- Splitting a drylining order between merchants: when it pays
When splitting a drylining material order between merchants pays: the costs a split adds, a simple test to run, and how to keep a split order under control.
- How to track margin on a live interiors job
How to track margin on a live interiors job: set a baseline, keep cost to complete and commitments in view, forecast the final account and review each week.
- Variations log template for drylining subcontractors
A variations log template for drylining subcontractors: the columns to keep, a blank table to copy, an example and how to use it with payment applications.
- Daywork sheets: what they need to get paid
What a drylining daywork sheet must show to get paid: the instruction, date, location, names and hours, materials and plant, and a signature on the day.
- Drylining productivity: m² per operative per day, and how to measure it
How to measure drylining productivity in m² per operative per day: split framing, boarding and taping, record real outputs and use them to price labour.
- Unit conversion in drylining quotes: per sheet, per m2, per pack
How to convert drylining quotes between per sheet, per m2, per pack and per metre, with simple formulas for boards, studs, fixings, insulation and compound.
- How to ask a merchant for a drylining quote, with a template
How to request a drylining materials quote from a merchant: what to send, the details that change the price, and a short template you can copy.
- How to take off an MF suspended ceiling
How to take off an MF suspended ceiling: measure the area, perimeter and bulkheads, build up the grid components and allow for drops, access and fixings.
- Payment applications and retention for drylining subcontractors
How drylining subcontractors apply for payment and track retention: what to include, dates that matter, how retention is worked out and how to get it back.
- Acoustic partitions: what changes in the price
What changes when you price an acoustic drylining partition: the required rating, insulation, board layers, independent frames, sealing and flanking details.
- How to price fire-rated drylining partitions
How to price fire-rated drylining partitions: read the fire strategy, price a tested system, its board layers, head details, fire stopping and records.