Acoustic ratings (Rw) explained for partitions
Last updated 2026-11-24 · 6 min read
Rw, the weighted sound reduction index, is a single-figure rating of how well a wall or floor reduces airborne sound, measured in a laboratory and given in decibels. A higher Rw means better sound insulation. It describes the construction under test conditions, not the finished room. Performance between finished rooms is measured on site, with figures such as DnT,w.
For a drylining subcontractor, the letters after the number matter as much as the number. "45 dB" can mean several different requirements, and some of them depend on far more than your wall.
What does an Rw rating mean?
A sample of the wall is built in a test laboratory between two rooms. Sound is played in one room and measured in the other across a range of frequencies. The results are compared with a reference curve to give one number, the Rw. The measurement and rating methods are set out in British and European standards, BS EN ISO 10140 for the laboratory measurement and BS EN ISO 717-1 for the rating.
Because the sample is built carefully in ideal conditions, the Rw is the best the construction can do. It is the figure you see in the manufacturer's system data.
What do Ctr and C mean?
They are adjustments added to Rw to reflect particular kinds of noise:
- Ctr gives more weight to low-frequency sound, such as traffic, bass music and some plant noise. It is usually a negative number, so Rw + Ctr is usually lower than Rw on its own.
- C reflects a spectrum of everyday mid- to high-frequency noise, such as speech.
A specification that asks for Rw + Ctr is asking for more than the same number in Rw.
How is Rw different from DnT,w?
| Term | Measured where | What it describes | Who controls it |
|---|---|---|---|
| Rw | Laboratory | The wall or floor as a tested element | The system and how it is built |
| Rw + Ctr | Laboratory | The element, weighted for low-frequency noise | The system and how it is built |
| DnT,w | On site | Sound insulation between two finished rooms | The whole construction: wall, ceiling, floor, façade, services and junctions |
| DnT,w + Ctr | On site | The same, weighted for low-frequency noise | The whole construction |
Approved Document E, which covers sound in buildings in England, uses laboratory figures for some internal walls and site-measured figures for separating walls and floors between dwellings. Requirements in Scotland, Wales and Northern Ireland are set by their own regulations. Check the current edition that applies to the job, and the specification, rather than assuming.
Why does a wall not reach its Rw on site?
Sound takes every path it can. On site it travels around the wall through ceiling voids, raised floors, ducts, the façade and continuous floor screeds, which is called flanking. It also finds gaps at the head, socket boxes and service penetrations. Workmanship matters too.
So a site figure is usually lower than the laboratory figure of the same wall. How much lower depends on the building, which is why the acoustic consultant, not the drylining system data alone, sets what is needed. The guide to pricing acoustic partitions covers the sealing and details that close the gap.
What should you ask when a spec gives an Rw figure?
For illustration only, with assumed specification wording and figures:
| Specification says | Ask | Why it matters |
|---|---|---|
| "Partitions to achieve 45 dB" | Is that Rw, Rw + Ctr or DnT,w? | Each is a different requirement |
| "Rw 45 dB" | Is a particular tested system named, or is the choice yours? | If yours, you must show the system data |
| "Rw + Ctr 45 dB" | Which systems meet it with Ctr included? | If a system's Ctr is assumed to be -5 dB, it needs an Rw of about 50 dB to reach 45 dB with Ctr included, which may be a heavier build-up |
| "DnT,w 45 dB between meeting rooms" | Who designs and builds the ceiling, floor and flanking details? | A site figure depends on trades outside your package |
| "Acoustic wall" with no figure | What rating is required, and from which report? | You cannot pick a system without one |
The third row is where an under-priced wall often comes from. The same number with Ctr added can mean a different build-up.
Who is responsible for the site figure?
That depends on the contract and on who holds design responsibility. If your package is to build a named tested system to the manufacturer's details, say so in your offer, and say that site performance depends on the whole construction. If you are asked to guarantee a DnT,w, find out what testing is planned and what happens if it fails.
Put your assumption in writing. The guide to qualifications and exclusions shows how, and the drylining tender checklist has the other questions to raise before you submit.
FixMargin is software for UK drylining and interiors subcontractors. It works out material build-ups for supported partition and wall lining systems, and the library does not yet cover every manufacturer. The costed BoQ, call-offs, purchase orders, goods received notes and invoice checks are on the Starter plan and above. You can start with a free account, which includes the calculator and one price list: fixmargin.com/signup.
Frequently asked questions
Is a higher Rw better?
Yes. A higher Rw means the construction reduced more airborne sound in the laboratory test.
What is the difference between Rw and DnT,w?
Rw is measured on a wall sample in a laboratory. DnT,w is measured between finished rooms on site and depends on the whole building, not only the wall.
Why is Rw + Ctr lower than Rw?
Ctr adds weight to low-frequency sound, which walls usually stop less well. It is usually negative, so the total comes out lower.
Can a partition guarantee a site test result?
Not on its own. Flanking paths, ceilings, floors and services all affect the site figure, so agree in writing what you are responsible for.