Returns and credit notes with builders merchants
Last updated 2026-11-10 · 6 min read
To return materials to a builders merchant, agree the return before anything leaves site: which items, whether they will accept them, any restocking or collection charge, and the rate the credit will be given at. Get a returns reference and a signed collection note, then chase the credit note and check it against the original invoice line.
Returns are where small amounts of money quietly go missing. The material leaves site, everyone assumes the credit will follow, and nobody checks whether it did. This guide covers surplus, wrong items and damage found after the delivery was signed for.
Which materials can usually go back?
It depends on the merchant's terms and your account, so read them before you assume anything. As a general pattern, merchants are more willing to take back:
- Full, unopened packs and bundles in saleable condition
- Items they delivered in error
They are often less willing, or unwilling, to take back:
- Cut lengths, split packs and loose items
- Boards with damaged edges or wet packaging
- Special orders, non-stock sizes and made-to-order items
- Anything held on site long enough to look used
Some terms also set a time limit for returns.
What should you agree before anything goes back?
Ring or email the branch first, then confirm in writing. Agree:
- The items and quantities, by product code, not by description
- The original invoice or delivery the goods came from
- Any restocking charge, as a percentage or a fixed amount
- Any collection charge, or whether you will drop the goods back yourself
- The credit rate, which should match the rate you were invoiced at
- A returns reference that will appear on the collection note and the credit note
On site, whoever hands the goods over should count them onto the vehicle and get the driver to sign a collection or uplift note showing the quantity. Take a photo of the note and of the stack. That is your evidence if the credit comes back short.
Is a return always worth it?
Not always. Compare what you get back with what it costs to send, and with the other uses for the material.
For illustration only, with assumed figures: at the end of a job you have 40 boards invoiced at £9.00 each and 30 studs invoiced at £5.00 each, all in full packs.
| Line | Amount |
|---|---|
| Value at invoiced rates (40 × £9.00 + 30 × £5.00) | £510.00 |
| Restocking charge at an assumed 15% | £76.50 |
| Collection charge, assumed | £45.00 |
| Net credit expected | £388.50 |
Here the return still brings back £388.50. If another job starting soon needs the same boards, moving them there may be better, as long as you can store them dry and you transfer the cost between the jobs. Either way, make the choice on purpose and record it.
How do you chase the credit note?
Treat every return as an open item until the credit note arrives. Log it alongside your invoice queries, with the returns reference, the date the goods left and the value you expect. The invoice query log has the columns you need, and a return fits in it as one more line.
When the credit note arrives, check it the same way you check an invoice:
- Does the quantity match the signed collection note?
- Is the rate the same as the original invoice line?
- Is the restocking charge what was agreed, and no more?
- Has VAT been treated the same way as on the original invoice?
- Is it on the right account and against the right job?
If anything is short, query it in writing with the collection note attached. If no credit note has arrived within a few weeks, ask for it.
How does a credit note reach the job cost?
Post the credit to the job and cost code the material was charged to, not to a general account. Otherwise the job looks more expensive than it was, and the overhead line looks cheaper.
Watch the timing too. If the original invoice was counted in one month's cost report and the credit lands in a later month, the job cost will dip when the credit arrives. That is fine as long as everyone knows why. The guide to checking supplier invoices covers the original invoice check that a credit note should mirror.
How do you keep returns down in the first place?
Most surplus comes from ordering the whole job in one go, or from not checking what is left before the last call-off. Order to areas and check stock on site before each call-off. The guide to drylining call-offs covers ordering to area budgets.
FixMargin is software for UK drylining and interiors subcontractors. It works out material build-ups for supported partition and wall lining systems, and the library does not yet cover every manufacturer. The costed BoQ, call-offs, purchase orders, goods received notes and invoice checks are on the Starter plan and above. You can start with a free account, which includes the calculator and one price list: fixmargin.com/signup.
Frequently asked questions
Will a merchant take back cut lengths or split packs?
Often not, but it depends on their terms. Ask before you send anything, and expect part packs to be refused or charged.
What is a restocking charge?
A charge the merchant makes for taking goods back into stock. It is set by their terms or agreed for the return, so confirm it in writing first.
Should the credit be at the price I paid?
It should normally match the rate on the original invoice, less any agreed charge. Check it line by line when the credit note arrives.
What evidence should I keep for a return?
The returns reference, the signed collection note, a photo of the goods and note, and the original invoice the items came from.