How to ask a merchant for a drylining quote, with a template

Last updated 2026-11-05 · 4 min read

Short answer

To ask a merchant for a drylining quote, send the same enquiry to each one: your bill of quantities with product, size and unit for every line, the delivery address and access, the number of drops and dates, and how long prices must hold. Ask them to price every line, list delivery charges separately, and mark any alternative.

A vague enquiry gets you a quote you cannot compare. If one merchant prices boards per sheet with delivery included and another prices per m² with carriage extra, you spend an evening untangling them. A good request does that work up front.

What should you send with the request?

Send your own list, not the merchant's. For each line include:

  • Product description: type, thickness, size, edge
  • Quantity and the unit you want it priced in
  • Any specified brand or system, if the spec requires it
  • Whether alternatives are acceptable

Add the job details that change the price: delivery postcode, site access, offloading needs, number of deliveries and rough dates, and the drawing revision you measured from.

Which details change the price most?

Delivery is the big one. Ask how carriage works for full loads and small drops, whether offloading is kerbside or to floors, and what they charge for a crane or a part-load. Then ask about:

  • How long the prices are valid
  • Lead times on less common items
  • Minimum order sizes and part packs
  • Account discount, and whether it is already applied
  • Whether prices include VAT

How do you make quotes easy to compare?

Ask every merchant to reply line by line against your list, in your units, with delivery and extras on separate lines. Ask them to mark any line they cannot supply and any alternative they have offered.

For illustration only: if you send a 40-line list to three merchants and each prices all 40 lines in your units, comparing them takes minutes. If one returns 32 lines in their own units, you have 8 gaps and a conversion job before you can compare totals.

What does a simple request template look like?

You can copy and adapt this:

'Hello, please could you quote for the materials on the attached list for [job name], [delivery postcode]. Please price each line in the unit shown and keep the line order. Show delivery, offloading and any small-drop charges on separate lines, and tell us how long the prices are valid. If you offer an alternative to any line, please mark it clearly. We expect [number] deliveries between [dates]. Drawings are revision [X]. Thanks, [name]'

What should you do when the quotes come back?

Check every line was priced, convert anything in a different unit, and add the extras. Then compare the full totals and the main lines. Keep the quote you accept with the job file, because you will need it when the invoices arrive.

FixMargin is software for UK drylining and interiors subcontractors. A working estimator went from signup to a priced bill of quantities in under 15 minutes, with no help. You can start with a free account, which includes the calculator and one price list: fixmargin.com/signup.

Frequently asked questions

How many merchants should I ask?

Enough for a fair comparison, usually two to four who can supply your area and job size.

Should I send my own list or ask for their format?

Send your own list in your units. It keeps every quote comparable line by line.

What if a merchant offers a different product?

Treat it as an alternative, not a match, until you have checked it suits the specified system.

Related guides

How to compare merchant quotes for a drylining BoQHow to check supplier invoices against orders and delivery notesUnit conversion in drylining quotes: per sheet, per m2, per pack