To compare merchant price lists for a drylining BoQ, price the same bill of quantities with every merchant. Match each line to the same product, convert every price to one unit such as per m² or per metre, add delivery and minimum order charges, then compare the whole BoQ total before the individual lines.
Send the same drylining BoQ to three merchants and you will get three different documents back. One prices boards per sheet, another per square metre. One lists stud by the length, another by the pack. Descriptions differ, and some lines come back as an alternative product.
The lowest total on the summary page may not be the lowest price for your job. Here is how to compare them properly.
Why start with one reference list?
Before you open any quote, fix your own list of materials. This is your costed BoQ: every item, the quantity you need, and the unit you will measure it in. It stays the same for every merchant.
The mistake is using the first quote as the template. If that merchant left a line out, you will not notice it missing from the others.
Send the same list to each merchant, with the same delivery details. The clearer your enquiry, the less cleaning up you do afterwards. State the drawing revision, the delivery location, any phasing, and how many drops you expect.
How do you match every line to the same product?
Go through each quote line by line and match it to your reference list. Merchants use their own codes and short descriptions, so check the things that change the product:
- Board type, thickness and sheet size
- Edge type on boards
- Stud and channel size, gauge and length
- Screw type and length
- Insulation type, thickness and pack size
Where a merchant offers an alternative, mark it clearly. Do not treat it as a match until you have checked that it suits the specified system. If the build-up relies on tested performance, check the manufacturer's data and ask the designer before you change anything.
How do you put every price in the same unit?
This is where most of the time goes, and where errors hide. Pick one unit for each item and convert every price to it.
For illustration only: for a board, that might mean dividing the sheet price by the sheet area. A 2.4 m by 1.2 m board is 2.88 m2, so the price per m2 is the sheet price divided by 2.88. At an assumed £14.40 a sheet, that is £5.00 per m2. For stud, divide the length price by its length in metres, or the pack price by the metres in the pack.
Then work out what you will really pay. If you need part of a pack and the merchant only sells full packs, the job carries the whole pack. Compare on quantity bought, not only on quantity needed.
What does the unit price leave out?
A quote is more than its rates. Note these on each one:
- Delivery and carriage charges, and any small-drop fee
- Offloading: kerbside or distributed to floors
- How long the prices are valid
- Lead times, especially on less common items
- Items marked subject to availability
- Account discount, and whether it is already included
- Whether VAT is in or out
A merchant who is cheaper on boards but cannot deliver when you need them may cost more once labour is standing around waiting.
Should you compare the whole BoQ or the lines first?
Total each quote against your reference list. Any item the merchant did not price needs filling in, or the total is not comparable. Show those gaps openly rather than leaving them at zero.
Then look line by line. Often no merchant is cheapest on everything. You may decide to split the order, for example boards from one and metal and fixings from another. That can work, but count the cost of it: a second account, extra deliveries, more paperwork and more invoices to check.
A useful question to ask yourself: what is the cheapest single merchant, and how much better is a split? If the gap is small, one supplier may be the better call.
What should you do with the comparison afterwards?
A clean comparison gives you something to negotiate with. You can show a merchant where they are out of line on a few big items, without giving away a competitor's whole quote.
Keep the winning quote with the job file. When the invoices arrive, you will want the rates and terms you agreed in front of you.
FixMargin is software for UK drylining and interiors subcontractors. On a free account you can load one price list and confirm or map the items it does not recognise. You can start with a free account, which includes the calculator and one price list: fixmargin.com/signup.
Frequently asked questions
How many merchants should I ask?
Enough to get a fair view without drowning in paperwork. Choose those who can actually supply your area and job size.
Should I always split an order to get the lowest price?
No. Weigh the difference against extra deliveries, accounts and invoice checks.
What if a merchant leaves out a line?
Ask them to price it. If they will not, use a price from elsewhere so the totals stay comparable.