Tracking your tender win rate

Last updated 2026-11-10 · 5 min read

Short answer

Your tender win rate is the tenders you won divided by the tenders that have a result, won or lost. Leave out tenders still pending, ones you declined and cancelled projects. Work it out by number and by value, and split it by client and type of work, because one overall figure hides where you win.

A win rate is one of the few numbers that tells you whether your estimating time is well spent. Tracked properly, it also tells you how much you need to price each year to keep your gangs busy.

How do you calculate a tender win rate?

Two ways, and you want both:

  • By number = tenders won / tenders decided
  • By value = value of tenders won / value of tenders decided

"Decided" means won or lost. A tender still waiting for a result would pull the rate down if you counted it as lost. A project the client cancelled tells you nothing about your price. And an enquiry you declined was never in the competition.

If the rate by value is much lower than the rate by number, you are winning the smaller jobs and losing the larger ones. That is worth knowing before you price the next large one.

What does a worked year look like?

For illustration only, with assumed figures. Over twelve months, a subcontractor logs 48 enquiries in its tender register.

LineNumberValue
Enquiries received48
Declined8
Priced and submitted40
Still pending6
Project cancelled2
Decided32£3,200,000
Won7£540,000
Lost25£2,660,000
Win rate21.9%16.9%

By number, it wins about one tender in four or five. By value, about one pound in six. The difference says the wins are mostly smaller packages.

Where do you win, and where do you not?

Split the decided tenders by client, sector and size. The same year, by client:

ClientDecidedWonWin rate by number
Contractor A10440%
Contractor B1218%
Contractor C10220%
Total32721.9%

Contractor B sent the most enquiries and gave the fewest wins. Before pricing their next one, ask why. They may be using you to check other prices, your exclusions may make your bids hard to compare, or your price may simply sit high for their kind of work. Feedback on each loss, logged in the register, helps answer that. The guide to how main contractors compare subcontract tenders explains what they look at.

Is a higher win rate always better?

No. A very high win rate can mean you are pricing too low. Compare the margin priced on the tenders you won with the margin on the ones you lost. If wins cluster at the lowest margins, your work is being won on price, and the jobs have little room for anything going wrong.

Keep in mind that a margin is a share of the selling price, not an addition to cost. The guide to markup vs margin explains why that matters when you compare tenders.

How many tenders do you need to price?

Use the value win rate to work back from the turnover you need.

For illustration only, continuing the example: to win £1,500,000 of work a year at a value win rate of 16.9%, you need to submit roughly £1,500,000 / 0.169 = about £8,900,000 of tenders that reach a result. If your estimators cannot price that much properly, you need to raise the win rate by choosing better, or accept a lower turnover.

This is also why declining the wrong enquiries matters. Time spent on a tender you were unlikely to win is time not spent on one you could.

What should you watch out for?

  • Small numbers. With 32 results, one extra win moves the rate by about three points. Look at the trend over a year or more, not a single month.
  • Late results. Some tenders never get a clear answer. Set a cut-off, such as three months after the return date, after which they count as lost.
  • Resubmissions. Count a revised price for the same package as one tender, not two.
  • Moving targets. A tender won after the scope was cut is still a win, but note the change in value.

The drylining tender checklist covers the checks that keep each price sound while you work on the rate.

FixMargin is software for UK drylining and interiors subcontractors. It works out material build-ups for supported partition and wall lining systems, and the library does not yet cover every manufacturer. The costed BoQ, call-offs, purchase orders, goods received notes and invoice checks are on the Starter plan and above. You can start with a free account, which includes the calculator and one price list: fixmargin.com/signup.

Frequently asked questions

What is a good tender win rate for a subcontractor?

There is no single figure. It depends on how selective you are and your mix of clients. Track your own rate over time and by client.

Should declined tenders count in the win rate?

No. You did not compete for them. Track how many you decline separately, with the reasons.

Should I track win rate by number or by value?

Both. By number shows how often you win. By value shows how much work that brings, and whether you win the larger jobs.

How long should I wait before counting a tender as lost?

Set a fixed cut-off, such as three months after the return date, and apply it to every tender.

Related guides

Drylining tender checklist: what to check before you submitHow to price a drylining job in the UKQualifications and exclusions on a drylining quote